Change of use in NSW: what to check when a shop becomes a cafe, clinic or salon

Turning a shop into a cafe, clinic or salon can need planning approval and a building classification check. The checks to run before you sign the lease.

KENURO architects

11/27/20263 min read

Nola cafe fit-out by KENURO architects: red tiled counter, pastry display and pendant lights
Nola cafe fit-out by KENURO architects: red tiled counter, pastry display and pendant lights

You have found a shop you like, and it was a newsagent last year. You want to run a cafe, a clinic or a salon from it. Before the lease is signed, it is worth knowing that "change of use" is a planning question first and a fit-out question second. The answers decide how long approval takes and what you can afford to build.

This guide covers the checks in the order we would run them in Sydney. It is general information, not advice on your particular property. Every council and every building is different.

1. Is the new use allowed on that site?

Each council's Local Environmental Plan (LEP) has a land-use table for every zone. A cafe sits under "food and drink premises". The table has to list your use as permitted with consent in the zone your shop is in. If it does not, you are looking at a different site, not a different form.

Two other points to check at the same time:

  • The current use has to be lawful. That means a development consent or complying development certificate was issued for it. Councils can usually provide copies of previous approvals from the property file.

  • The most recent consent for the shop may carry conditions on hours, noise, waste, loading and parking. A new use generally has to follow them.

2. Does the change need approval at all?

It depends on the old and new use. Some changes are small. Others need a full approval.

  • A change from one type of retail shop to another is not treated as a change of use. It is a change of tenant.

  • A shop changing to business premises or office premises can be exempt development, as long as the usual exempt conditions are met. Exempt development generally cannot be carried out on a State heritage item or land under an interim heritage order.

  • A shop becoming a cafe or restaurant does need planning approval. It can go through the council as a development application, or through a council or private certifier as a complying development certificate (CDC) if the proposal meets the development standards in the State planning policy for exempt and complying development. Those standards include a limit on seats and compliance with AS 4674, the Australian Standard for the design, construction and fit-out of food premises. When a CDC is available, the NSW Government says it can be issued in as few as 20 days.

  • For a clinic or a salon, the use needs to be classified correctly first. Whether it counts as business premises, a medical centre or something else decides which pathway applies, so ask your certifier or council early.

3. What does the Building Code say about the new use?

A change of use can change the building's classification under the National Construction Code, and with it the fire safety, exits, sanitary facilities and accessibility the premises must have. Moving a shop to a cafe usually means more people in the space and more to check. Nothing here is a given until a certifier has looked at the drawings. Also check structural and fire performance if the floor area is growing.

4. What does the use bring with it?

  • Cafe: council notification of the food business, a food safety supervisor where required, the Food Standards Code, and in many cases a connection to water and sewer services under section 68 of the Local Government Act 1993. Grease management and ventilation shape the layout. The kitchen takes space from the shop floor.

  • Clinic: privacy between rooms, hygiene finishes, hand basins, and an accessible path to every room patients use.

  • Salon: plumbing for basins and chairs, ventilation and drainage, and power for equipment at each station.

Parking can matter too. The number of spaces required can rise when one use becomes another, and the old consent or the council's plans set the rate.

5. Order the work to protect the lease

  1. Confirm the use is permitted in the zone, with the council or a planner.

  2. Get the previous consent and read its conditions.

  3. Ask a certifier which approval pathway applies and what the building classification means for your fit-out.

  4. Have an architect test the layout on the real floor plan before you sign.

  5. Write approval timing into the lease. Consider asking for the lease to depend on approval, or for rent-free time while approval runs.

The shop that looks cheap on rent can turn out to be the expensive one if the use is not allowed or the building needs major upgrades. A day of checks before signing costs far less than a delayed opening.

If you are weighing a shop for a cafe, clinic or salon, KENURO can look at the premises with you before you commit and tell you what a change of use is likely to involve.